检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨晓川[1,2] 李纹槿 张健 Yang Xiaochuan;Li Wenjin;Zhang Jian(School of Architecture,South China University of Technology,Guangzhou,510641)
机构地区:[1]华南理工大学建筑学院,广州510641 [2]华南理工大学建筑设计研究院有限公司,广州510641
出 处:《建设科技》2023年第2期67-71,共5页Construction Science and Technology
摘 要:近年来,办公和酒店复合的超高层综合体建筑日益增多。在酒店位于塔楼顶部的超高层综合体中,从低区办公业态转换至高区酒店业态时,由于核心筒面积需求减少,且酒店客房较办公空间的合理使用进深更浅,须对标准层进行缩减调整。本文通过对已建成案例及相关工程实践经历的梳理和分析,归纳出填充式、中庭式、边庭式、收束式和退台式五种塔楼顶部空间变化形式,并对相应的实施技术要点进行探讨分析,以期为超高层塔楼顶部酒店的空间高效利用设计提供一定的参考借鉴。In recent years,the number of office and hotel complex high-rise buildings is increasing.In the super high-rise complex with the hotel located at the top of the tower,there is a switch that the hotel is converted from the low-area office business to the high-area hotel business.Due to the reduced demand for the core tube area as well as the shallower depth of reasonable use of hotel rooms than the office space,the standard floor must be reduced and adjusted.Through analyzing the completed cases and relevant engineering practices,this paper sums up five types of space change forms of the tower top,namely filling type,atrium type,side court type,bundling type and platform retraction type.It also discusses and analyzes the corresponding implementation technical points,with a view to providing reference for the design of hotel space efficient use on the top of the super high-rise tower.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.40