作 者:胡鹏 张慧霞 乔曙 温哲昊 HU Peng;ZHANG Huixia;QIAO Shu;WEN Zhehao(PowerChina Chengdu Engineering Co.,Ltd,Chengdu Sichuan 610072;Sichuan Huaneng Luding Hydropower Co.,Ltd.,Luding Sichuan 626100)
机构地区:[1]中国电建集团成都勘测设计研究院有限公司,四川成都610072 [2]四川华能泸定水电有限公司,四川泸定626100
出 处:《四川水力发电》2023年第1期44-47,63,共5页Sichuan Hydropower
摘 要:硬梁包水电站充分利用工程开挖料满足了工程所需填筑料、混凝土骨料、垫层料、振冲填料等,剩余开挖料还用于库区垫高防护工程,回采利用率达到95%。工程开挖料利用结合开挖料种类、料源需求、施工总进度、转存料场布置等统筹规划、合理利用,既解决了弃渣难的问题又节省了工程投资,可供其他工程参考。Yingliangbao Hydropower Project makes full use of the excavated materials to meet demand of filling materials,concrete aggregates,cushion materials,vibratory fillings,etc.The remained excavated materials are also used for the protection project of the reservoir area.The utilization rate reached 95%.The utilization of the excavation materials in the project is combined with the overall planning and rational utilization of the types of excavation materials,the demand for material sources,the overall progress of the construction,and the layout of the dumping material yard,which not only solves the problem of waste slag,but also saves the project investment.Experience mentioned above can be used as reference for other projects.
分 类 号:TU753.1[建筑科学—建筑技术科学]