检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:江平[1] 陈璐[2,3] 易彬 郭鹤翔 刘一卓 JIANG Ping;CHEN Lu;YI Bin;GUO He-xiang;LIU Yi-zhuo(Meizhou Hydrological Bureau,Meizhou 514000,Guangdong Province,China;School of Civil and Hydraulic Engineering,Huazhong University of Science and Technology,Wuhan 430074,Hubei Province,China;Hubei Key Laboratory of Digital Valley Science and Technology,Huazhong University of Science and Technology,Wuhan 430074,Hubei Province,China)
机构地区:[1]广东省水文局梅州水文分局,广东梅州514000 [2]华中科技大学土木与水利工程学院,湖北武汉430074 [3]华中科技大学数字流域科学与技术湖北省重点实验室,湖北武汉430074
出 处:《中国农村水利水电》2023年第3期53-59,73,共8页China Rural Water and Hydropower
基 金:国家自然科学基金项目(51922047,51879109);广东省水利科技创新项目(2020-23);湖北省自然科学基金杰出青年人才项目(2020CFA101);西藏自治区科技计划项目(XZ202301YD0044C)。
摘 要:单位线是中小流域汇流计算的常用方法,现有综合单位线法存在无法考虑降雨时空分布不均性和下垫面异质性的问题,导致预报精度欠佳;此外,传统分布式单位线计算过程复杂,且需要大量数据,限制了其在中小流域的应用。为此,本文引入分布式单位线概念,综合考虑洪水传播时间和洪峰滞时,提出了基于流域初始单位线的分布式坦化流域汇流模型,该模型通过推求一系列坦化单位线,为各雨量站适配不同的分布式单位线,进而计算流域出口断面的洪水过程。研究以梅州流域尖山水文站点以上流域为例,基于21个雨量站点实测降雨数据,构建了分布式坦化单位线汇流模型,采用洪峰相对误差、峰现时间误差、确定性系数等指标进行模型适用性评价,并与现有综合单位线法进行了比较分析,实例研究表明所提方法的洪峰相对误差、峰现时间误差小于综合单位线法,确定性系数明显提升,整体上分布式坦化单位线法预报结果优于现有综合单位线法。所提方法简化了现有分布式单位线推求步骤,提高了洪水预报精度,易于在中小流域进行推广。The unit hydrograph method is commonly used for the calculation of flow routing in the small and medium-sized basins.However,the current synthetic unit hydrograph method cannot consider the heterogeneity of temporal and spatial distribution of rainfall and the heterogeneity of underlying surface,resulting in poor prediction accuracy.In addition,the current distributed unit hydrograph calculation process is complicated and requires plenty of data,which limits its application in small and medium-sized basins.To this end,the concept of distributed unit hydrograph is introduced in this study.Based on the flow travel time and the lag time of flow peak,a distributed unit hydrograph model considering the attenuation actions is proposed.After a group of unit hydrographs are calculated,different distributed unit hydrograph accorporates to each watershed.Then,the flood process of the outlet basin can be calculated.The Meizhou River basin is selected as a study case.A distributed unit hydrograph model considering attenuation actions is established based on the observed rainfall data of 21 rainfall stations.The relative flood peak error,flood peak appearance time error and deterministic coefficient are used to evaluate the applicability of the model,and the result of the current synthetic unit hydrograph method is compared with the proposed method.The result shows that the relative peak error and peak appearance time error of the proposed method are smaller than those of the synthetic method and the certainty coefficient is significantly improved.On the whole,the accuracy of the proposed method is better.The proposed method simplifies the calculation steps of the distributed unit hydrograph,improves the accuracy of flood prediction,which is easy to be popularized in small and mediumsized basins.
分 类 号:TV124[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.117.230.120