检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘水华[1] Liu Shuihua(Taiyuan Coal Gasification(Group)Co.,Ltd.,Shanxi Taiyuan 030000)
机构地区:[1]太原煤炭气化(集团)有限责任公司,山西太原030000
出 处:《山东煤炭科技》2023年第2期45-47,共3页Shandong Coal Science and Technology
摘 要:神州煤业4604(1)工作面为充填试采面,若充填步距过小,影响回采推进速度,若充填步距过大,直接顶控制不到位,进而破坏地表建筑物。通过运用顶板极限跨距理论计算确定充填步距。现场充填试验表明:充填后地表最大下沉值98 mm,最大拉伸变形0.22 mm/m,最大压缩变形0.23 mm/m,最大倾斜变形0.44mm/m,均在I损坏变形范围以内,达到了预期效果。The 4604(1)working face of Shenzhou Coal Industry is the filling trial mining face,if the filling step distance is too small,it will affect the mining advance speed;if the filling step distance is too large,the direct roof control is not in place,thus destroying the surface buildings.The filling step is determined by using the roof limit span theory.The field filling test shows that the surface maximum subsidence value is 98 mm,the maximum tensile deformation is 0.22 mm/m,the maximum compression deformation is 0.23 mm/m and the maximum inclination deformation is 0.44 mm/m.All of them are within the range of I damage and deformation,and the expected results are achieved.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171