顶板极限跨距在神州煤业充填开采的运用  

Application of Roof Limit Span in Shenzhou Coal Industry Filling Mining

在线阅读下载全文

作  者:刘水华[1] Liu Shuihua(Taiyuan Coal Gasification(Group)Co.,Ltd.,Shanxi Taiyuan 030000)

机构地区:[1]太原煤炭气化(集团)有限责任公司,山西太原030000

出  处:《山东煤炭科技》2023年第2期45-47,共3页Shandong Coal Science and Technology

摘  要:神州煤业4604(1)工作面为充填试采面,若充填步距过小,影响回采推进速度,若充填步距过大,直接顶控制不到位,进而破坏地表建筑物。通过运用顶板极限跨距理论计算确定充填步距。现场充填试验表明:充填后地表最大下沉值98 mm,最大拉伸变形0.22 mm/m,最大压缩变形0.23 mm/m,最大倾斜变形0.44mm/m,均在I损坏变形范围以内,达到了预期效果。The 4604(1)working face of Shenzhou Coal Industry is the filling trial mining face,if the filling step distance is too small,it will affect the mining advance speed;if the filling step distance is too large,the direct roof control is not in place,thus destroying the surface buildings.The filling step is determined by using the roof limit span theory.The field filling test shows that the surface maximum subsidence value is 98 mm,the maximum tensile deformation is 0.22 mm/m,the maximum compression deformation is 0.23 mm/m and the maximum inclination deformation is 0.44 mm/m.All of them are within the range of I damage and deformation,and the expected results are achieved.

关 键 词:顶板 充填 步距 极限跨距 

分 类 号:TD823.7[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象