检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王书国 Wang Shuguo(Binzhou City Water Resources Development and Construction Center,Binzhou,China)
出 处:《科学技术创新》2023年第6期101-104,共4页Scientific and Technological Innovation
摘 要:进水前池是连接泵站与河道的建筑物,不良前池流态会给泵站的稳定运行造成严重影响。此次研究以某排灌站为例,利用PIV模型试验的方式,探讨了底坎对侧向进水池前池流态的整流效果的影响。结果显示,设置底坎可以获得显著的整流效果,且底坎断面为梯形、高和底宽分别为池深的0.5倍和0.3倍,与进水池的距离为水泵叶轮直径的10倍时整流效果最佳,可以为工程建设的顺利进行以及相关类似研究提供支持和借鉴。The intake forebay is a building connecting the pump station and the river.The bad flow pattern of the forebay will seriously affect the stable operation of the pump station.In this study,taking a drainage and irrigation station as an example,the influence of the bottom sill on the rectification effect of the flow pattern in the forebay of the side inlet pool is discussed by means of PIV model test.The results show that the setting of the bottom sill can obtain significant rectification effect,and the cross section of the bottom sill is trapezoidal,the height and the bottom width are 0.5 times and 0.3 times of the pool depth respectively.When the distance from the bottom sill to the water inlet pool is 10 times of the pump impeller diameter,the rectification effect is the best,which can provide support and reference for the smooth construction of the project and related similar research.
分 类 号:TV675[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249