检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杜聿笙 Du Yusheng(CCCC Tunnel Engineering Co.,Ltd.,Beijing,China)
机构地区:[1]中交隧道工程局有限公司,北京
出 处:《科学技术创新》2023年第5期121-124,共4页Scientific and Technological Innovation
摘 要:砂卵石地层地铁盾构作业面沉降的处理效果,对地铁施工安全具有直接的影响。但是,现阶段砂卵石地层地铁盾构作业面沉降问题较为常见,一旦控制不当,极易引发地铁工期延滞。因此,以一个砂卵石地层地铁盾构项目为例,探讨了砂卵石地层地铁盾构施工沉降规律表现以及控制技术。希望为同类型砂卵石地层地铁盾构施工沉降处理提供参考,做好盾构期间沉降控制,把控技术质量,保障地铁工程安全稳定推进。The settlement treatment effect of metro shield working face in sandy gravel stratum has a direct impact on metro construction safety.However,at this stage,the settlement problem of metro shield working face in sandy gravel stratum is relatively common.Once it is not properly controlled,it will easily lead to the delay of metro construction period.Therefore,taking a metro shield project in sandy gravel stratum as an example,this paper discusses the settlement law and control technology of metro shield construction in sandy gravel stratum.It is hoped to provide reference for the settlement treatment of metro shield construction in the same type of sandy gravel stratum,do well in the settlement control during shield construction,control the technical quality,and ensure the safe and stable progress of the metro project.
分 类 号:U455.43[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.13