检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蔡华武 Cai Huawu(Changsha Municipal Engineering Co.,Ltd.,Changsha,China)
出 处:《科学技术创新》2023年第5期187-190,共4页Scientific and Technological Innovation
摘 要:根据某三跨预应力混凝土连续刚构桥梁施工现场环境条件,拟运用挂篮与过渡墩形成吊架方案对合龙段、现浇段进行施工。基于该桥梁工程施工特点,论述了现浇段吊架施工的整体方案设计,并通过对吊篮受力状况的分析,总结了施工技术要点,验证了所采用施工方案的可行性,旨为同类工程施工提供了技术参考。According to the environmental conditions of the construction site of a three-span prestressed concrete continuous rigid frame bridge,it is proposed to use the hanging basket and transition pier to form a hanger scheme to construct the closure section and cast-in-situ section.Based on the construction characteristics of the bridge project,discusses the overall scheme design of the cast-in-place section hanger construction,summarizes the key points of construction technology through the analysis of the stress condition of the basket,verifies the feasibility of the adopted construction scheme,and aims to provide technical reference for the construction of similar projects.
分 类 号:U445.57[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200