检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:郭万欣 王玲军 GUO Wanxin;WANG Lingjun(Yellow River Water Conservancy and Hydropower Development Group Co.,Ltd.,Jiyuan 459017,China)
机构地区:[1]黄河水利水电开发集团有限公司,河南济源459017
出 处:《水电与新能源》2023年第3期57-59,共3页Hydropower and New Energy
摘 要:小浪底水利枢纽泄洪排沙期间,由于过机含沙量增加,高含沙水流对机组主轴密封的磨损量增加,严重影响机组安全稳定运行。通过分析高含沙水流对机组主轴密封的影响,采取了主轴密封水倒换为清水供水,顶盖下腔冲洗泵持续运行,顶盖内手动冲淤,机组停机避沙等一系列措施,减少泥沙对主轴密封的磨损,保障了机组的安全稳定运行和发电计划的完成,也保证了机组按照电网调度要求“调峰调谷”,减少弃水情况的发生,使小浪底水利枢纽的综合效益得到充分发挥。During the flood discharge and sediment flushing period of Xiaolangdi Hydropower Station,the abrasion of the main shaft seal of hydro-turbine units caused by hyper-concentrated sediment flow increases due to the increase of the sediment concentration through the units,which seriously affects their safe and stable operation.The influence of hyper-concentrated sediment flow on the main shaft seal is analyzed.Then,a series of countermeasures are adopted to reduce the abrasion of the main shaft seal caused by sediment,such as the switching of the main shaft seal water with clean water supply,continuous operation of the lower cavity flushing pump under the head cover,manual silt flushing in the head cover,and shutdown of the units to avoid sediment abrasion.These measures ensure the safe and stable operation of the units,and the completion of the power generation plan.They also ensure that the units can carry out peak and valley regulation according to the dispatching requirements of the power grid and reduce the occurrence of water abandonment.Thus,the comprehensive benefits of the project can be fully utilized.
分 类 号:TV734.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.223.109.25