检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王海旗 刘星廷 冯三勇 WANG Haiqi;LIU Xingting;FENG Sanyong(l.Electric Power Research Institute of State Grid Shanxi Electric Power Company,Taiyuan,Shanxi 030001,China;State Grid Shanxi Electric Power Company,Taiyuan,Shanxi 030001,China)
机构地区:[1]国网山西省电力公司电力科学研究院,山西太原030001 [2]国网山西省电力公司,山西太原030001
出 处:《山西电力》2023年第1期47-51,共5页Shanxi Electric Power
摘 要:光伏并网发电要求其在弱电网条件下稳定运行。针对有电压前馈环节控制系统的光伏并网系统,通过改进前馈电压的控制策略和调整控制器参数,以减小并网电流的畸变率,达到了弱电网条件下的并网要求,并在PSCAD仿真环境中对所提出方法的有效性进行了验证。Photovoltaic grid-connected power generation requires stable operation under weak grid conditions.For the photovoltaic grid-connected system with voltage feedforward link control system,the control strategy of feedforward voltage is improved and the controller parameters are adjusted to reduce the distortion rate of grid-connected current,which helps to meet the grid-connected requirements under the weak grid conditions.Finally,the effectiveness of the proposed method is verified by PSCAD simulation.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229