检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄棚兰 庞晶津 陈茗 陈仪 王新端 吴军[2] HUANG Peng‑lan;PANG Jing‑jin;CHEN Ming;CHEN Yi;WANG Xin‑duan;WU Jun(Yangzhou Municipal Pipe Network Co.Ltd.,Yangzhou 225000,China;School of Abstract Environmental Science and Engineering,Yangzhou University,Yangzhou 225009,China)
机构地区:[1]扬州市政管网有限公司,江苏扬州225000 [2]扬州大学环境科学与工程学院,江苏扬州225009
出 处:《中国给水排水》2023年第5期74-79,共6页China Water & Wastewater
摘 要:外水流量的估计和入流点查找是污水管网运行的难题。基于此,首先应用污水管网综合模型,建立了区域内生活和工业用水量、泵站液位、泵站流量和外水流量之间的动态平衡关系,以估计外水流量;再应用污水管网机理模型,在不同外水入侵点假设条件下,计算管网水力状态,并与实际污水管网运行水力状态进行对比,估计污水管网外水入流点的位置。用此方法对某区域进行外水查找,并封堵外水源头后,该区域旱季污水平均流量从2.0×10^(4) m^(3)/d降低到与实际用水量相当的0.5×10^(4) m^(3)/d左右,COD平均浓度从92.4 mg/L提升至290.2 mg/L。其他污染指标如氨氮、TN、TP、SS和VSS等,均获得了3倍以上的提升;污水管网从高液位运行的满管流转变为低液位运行的非满管流。该基于污水管网模型的外水流量和入流位置的估计方法,有助于促进污水管网运行质态的提升和提质增效。The estimation of external water flow and location of inflow point is a difficult problem in sewage pipe network operation.Firstly,the dynamic equilibrium among domestic and industrial water consumption,pump station water level,pump station flow and external water flow was established by using the sewage pipe network comprehensive model,so as to estimate the external water flow.Then,the sewage pipe network mechanism model was applied to calculate the hydraulic state of the pipe network under the assumption of different external water intrusion points,and the operating hydraulic state of the actual sewage pipe network was compared to obtain the estimated location of the external water intrusion point in the sewage pipe network.The method was applied to search the external water in an area.After plugging the source of external water,the sewage flow in this area decreased from the average flow of 2.0×10^(4) m^(3)/d in dry season to approximately 0.5×10^(4) m^(3)/d which was equivalent to the actual water consumption,and the average COD increased from 92.4 mg/L to 290.2 mg/L.Other pollution indicators,such as ammonia nitrogen,TN,TP,SS and VSS,were all increased by more than three times.The sewage pipe network was changed from full pipe flow with high water level to non‑full pipe flow with low water level.The method for estimating external water flow and inflow location based on sewage pipe network model is helpful to improve the operational quality of sewage pipe network and improve the quality and efficiency of sewage treatment.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229