检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张绍周 苏之品 陈玉明[2] ZHANG Shaozhou;SU Zhipin;CHEN Yuming(Kunming Industrial Vocational and Technical College,Kunming 650302,China;Kunming University of Science and Technology,Kunming 650031,China)
机构地区:[1]昆明工业职业技术学院,昆明650302 [2]昆明理工大学,昆明650031
出 处:《有色金属(矿山部分)》2023年第2期26-34,共9页NONFERROUS METALS(Mining Section)
基 金:云南省教育厅科学研究基金项目(2023J1649);云南省高校科技创新团队支持计划资助项目(IRTSTYN)。
摘 要:某矿为薄层状矿体,矿体之间存在以泥质粉砂岩为主的软弱夹层,采场稳定性较差,不利于矿山安全生产。课题组应用3D-σ软件对矿区采场建立三维模型,对2种开采方案、3种采场结构参数进行数值模拟,计算和分析采场回采过程中矿岩体的应力、位移、塑性区及安全率的分布状况,判断采场的稳定性。数值模拟计算结果表明:采场和中段之间均留2 m的连续间柱和顶柱是非常有必要的,抑制顶板变形破坏有明显的作用,但是仍然无法控制采场顶板的破坏;在采场内留2 m×2 m点柱的条件下,点柱间的矿块跨度控制在6 m以内能保证顶板的稳定。通过安全率回归方程计算得出:在满足安全率大于1.15时,点柱间矿块的合理跨度应小于6.027 m。同时为提高采场矿石的回采率,综合考虑最终确定点柱间的矿块跨度为6 m,能达到安全与经济的有效平衡,研究成果为该矿山的安全生产提供理论性指导。A certain mine is a thin-layered ore body,and there are weak interlayers mainly composed of argillaceous siltstone between the ore bodies,and the stope stability is poor,which is not conducive to the safe production of the mine.The research group used 3D-σsoftware to establish a three-dimensional model of the stope in the mining area,carried out numerical simulations on 2 mining schemes and 3 stope structure parameters,and calculated and analyzed the stress,displacement,plastic zone and The distribution of the safety rate is used to judge the stability of the stope.The numerical simulation results show that it is very necessary to leave 2 meters of continuous inter-columns and roof columns between the stope and the middle section,and it has an obvious effect on restraining the deformation and damage of the roof,but it still cannot control the damage of the stope roof;Under the condition that 2 m×2 m point pillars are left in the field,the span of ore blocks between points and pillars is controlled within 6m to ensure the stability of the roof.According to the calculation of the safety rate regression equation:when the safety rate is greater than 1.15,the reasonable span of the ore block should be less than 6.027 m.At the same time,to improve the recovery rate of the ore in the stope,the span of the ore blocks between the points and pillars is finally determined to be 6 m,which can achieve an effective balance between safety and economy.The research results provide theoretical guidance for the safe production of the mine.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.14.7.99