节段间“金属接触+高强螺栓”联合受力钢塔柱的线形控制技术  被引量:2

Alignment Control Technology of Steel Pylon by United Stress of "Metal Contact + High-strength Bolt" between Segments

在线阅读下载全文

作  者:李军平[1] LI Junping

机构地区:[1]中铁宝桥集团有限公司,陕西宝鸡721006

出  处:《城市道桥与防洪》2023年第3期57-60,79,M0007,共6页Urban Roads Bridges & Flood Control

摘  要:钢塔节段间常见的连接方式有“金属接触+高强度螺栓”连接与焊接连接两种,不管塔段间采用哪种连接方式,确保钢塔柱的成桥线形非常重要。以塔段间“金属接触+高强螺栓”联合受力钢塔柱为例,详细介绍了该类钢塔柱的建造难点及确保塔柱线形的技术措施,可供相关人员参考。The common connection methods between the segments of steel pylon are two methods of"metal contact+high-strength bolt"connection and welding connection.It is very important to ensure the steel pylon alignment of the completed bridge in spite of the connection mode between the pylon segments.Taking the steel pylon by united stress of"metal contact+high-strength bolt"between pylon segments as an example,the difficulties to construct this kind of steel pylon and the technical measures to ensure the pylon alignment are introduced in detail,which can be referred for the similar projects.

关 键 词:桥梁钢塔 节段 接口匹配 线形控制 预拼装 

分 类 号:U445[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象