检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周浩 ZHOU Hao
机构地区:[1]上海市政工程设计研究总院(集团)有限公司,上海市200092
出 处:《城市道桥与防洪》2023年第3期85-87,M0010,共4页Urban Roads Bridges & Flood Control
摘 要:大跨度拱桥上设置人行桥结构新颖,探明人行桥对下承式系杆拱桥抗震性能的影响有重要意义。以深圳市某下承式系杆拱桥为研究对象,通过动力时程方法分析成桥阶段是否设置人行桥对全桥抗震性能的影响。研究表明:设置人行桥降低了纵竖向地震作用下桥上拱肋和吊杆的应力,增加了横竖向地震作用下桥上拱肋和吊杆的应力,对于桩基础影响不大。The structure of footbridge set on long-span arch bridge is novel.It is greatly significant to verify the impact of footbridge on the seismic performance of through bowstring arch bridge.Taking a bowstring arch bridge in Shenzhen as the research object,the impact of setting the footbridge on the seismic performance of the whole bridge in the stage of bridge completion is analyzed by dynamic time history method.The research shows that the setting of footbridge can reduce the stresses of bridge arch rib and boom under the longitudinal and vertical seismic actions,and increase the stresses of bridge arch rib and boom under the transverse and vertical seismic actions,which have little effect on pile foundation.
关 键 词:下承式系杆拱桥 仿真模型 动力时程方法 抗震分析
分 类 号:U448.22[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7