某公路斜拉桥现浇箱梁挂篮方案比选分析  

Comparison and Selection of Form Traveler Scheme for Cast-in-place Box Girder of a Highway Cable-stayed Bridge

在线阅读下载全文

作  者:杨广 谭子盈 YANG Guang;TAN Ziying

机构地区:[1]广东顺控交通投资有限公司,广东佛山528000

出  处:《城市道桥与防洪》2023年第3期154-156,M0015,共4页Urban Roads Bridges & Flood Control

摘  要:主梁挂篮施工作为斜拉桥施工的关键环节之一,对桥梁质量安全、工期、造价等具有显著性影响。通过对牵索挂篮和组合式菱形挂篮施工方案进行技术、安全和经济性分析,论证后支点式菱形挂篮在宽幅斜拉桥主梁施工中的适用性,为类似工程提供参考和借鉴意义。As one of the key links of cable-stayed bridge construction,the form traveler construction of main girder has a significant impact on the quality safety,construction period and engineering cost of the bridge.Taking the bent cap of viaduct in the main urban line of a project as an example,the construction schemes of the cable form traveler and the combined diamond form traveler are analyzed from the technology,safety and economy to demonstrate the feasibility of the rear fulcrum diamond form traveler in the construction of the main girder of wide cable-stayed bridge,which can be referred for the similar projects.

关 键 词:斜拉桥 牵索挂篮 组合式菱形挂篮 

分 类 号:U445[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象