水击压力对泄洪输水隧洞结构配筋的影响  

Impact of Water Hammer Pressure on StructureReinforcement of Flood Discharge and Water Conveyance Tunnel

在线阅读下载全文

作  者:石维 SHI Wei(Yunnan Xiuchuan Water Resources and Hydropower Survey and Design Co.,Ltd.,Kunming 650021,China)

机构地区:[1]云南秀川水利水电勘察设计有限公司,云南昆明650021

出  处:《云南水力发电》2023年第3期126-128,共3页Yunnan Water Power

摘  要:水工隧洞设计时,通常将水流势能作为计算依据,常常忽略了水流动能在闸门关闭时形成的水击压力对隧洞结构配筋的影响。以某水库正常蓄水位工况下泄洪为例,计算不同闸门关闭时间产生的水击压力,从而分析得出水击压力对泄洪输水隧洞配筋影响。In the design of hydraulic tunnel,flow potential energy is usually taken as the calculation basis,and the influence of water hammer pressure formed by water flow energy on reinforcement of tunnel structure when gate is closed is often neglected.Taking flood discharge of a reservoir under normal water level as an example,the water hammer pressure generated by different off times of gates is calculated,and the influence of water hammer pressure on reinforcement of flood discharge and water conveyance tunnel is analyzed.

关 键 词:泄洪输水隧洞 水击压力 结构配筋 关闭时间 

分 类 号:TV134[水利工程—水力学及河流动力学] TV312

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象