检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邹忠卫 ZOU Zhong-wei(Zhanjiang Gaoyuan Engineering Consulting Co.,Ltd.,Zhanjiang 524000,China)
机构地区:[1]湛江市高远工程咨询有限公司,广东湛江524000
出 处:《云南水力发电》2023年第3期146-148,共3页Yunnan Water Power
摘 要:对溢洪道原设计方案按1∶40建立水工模型,对水库不同运行工况下溢洪道泄流能力、泄槽流态及消力池消能效果进行水工模型试验。水工试验通过试验-修改-试验等过程和反复探索,优化枢纽布置、建筑物型式和有关设计参数,为设计最终优化方案提供可行、可靠的依据。通过水工模型试验成果对原设计方案进行局部优化,较好地解决溢洪道泄流能力不足、泄槽流态波动大及消能效果不佳等问题。In this paper,a hydraulic model is established for the original design scheme of spillway according to 1:40,and a hydraulic model test is carried out for the discharge capacity,flow pattern of spillway and energy dissipation effect of stilling basin under different operating conditions of reservoir.Hydraulic test optimizes the layout of complex,building type and relevant design parameters through test-modification-test and repeated exploration,which provides feasible and reliable basis for the final optimization design.Through the results of hydraulic model test,the original design scheme was optimized locally to solve the problems of insufficient discharge capacity of spillway,large fluctuation of flow pattern of discharge channel and poor energy dissipation effect.
分 类 号:TV222[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7