检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:石维 SHI Wei(Yunnan Xiuchuan Water Resources and Hydropower Survey and Design Co.,Ltd.,Kunming 650021,China)
机构地区:[1]云南秀川水利水电勘察设计有限公司,云南昆明650021
出 处:《云南水力发电》2023年第3期202-205,共4页Yunnan Water Power
摘 要:不同地质条件下,泄洪输水放空隧洞开挖后的初期支护对减少围岩变形,保障施工安全有重要意义。采用RocSupport模拟了泄洪输水放空隧洞开挖及初期次支护过程,分析了不同地质条件下(Ⅳ、V类围岩)的围岩稳定性,得出V类围岩收敛变形效率较快,应及时支护并考虑预留变形量,为设计成果进行数值校核,确保初期支护措施的可靠性。Under different geological conditions,the initial support after excavation of the flood discharge and water conveyance drainage tunnel is of great significance to reduce the deformation of surrounding rocks and ensure construction safety.In this paper,RocSupport is used to simulate the excavation and initial support process of the flood discharge and water conveyance vent tunnel,and to analyze the stability of surrounding rocks under different geological conditions(IV and V surrounding rocks).The result shows that the convergence and deformation efficiency of V-type surrounding rock is very fast.It is necessary to support in time and consider the reserved deformation to check the value for design results and ensure the reliability of initial support measures.
分 类 号:TV672.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.138.36.87