作 者:付永春 FU Yong-chun(Yunnan Water Investment Project Management Consulting Co.,Ltd.,Kunming 650051,China)
机构地区:[1]云南水投工程管理咨询有限公司,云南昆明650051
出 处:《云南水力发电》2023年第3期236-239,共4页Yunnan Water Power
摘 要:瓦窑隧洞为滇中引水鲁地拉水电站水资源综合利用配套二期输水工程的控制性节点项目,施工工期紧,任务重。隧洞围岩多为强风化岩体,节理裂隙发育,岩石破碎,地下水位高,围岩类别以IV类、V类为主,V类居多,成洞条件差。为确保工程进度和质量,采用掘进机法开挖,取得了较好成果。对该隧洞掘进机法进行了总结和分析,以利后续掘进机法开挖长距离小断面隧洞。Wayao Tunnel is a control joint project of the second stage water conveyance project for comprehensive utilization of water resources of Ludila Hydropower Station.It has a tight construction period and heavy tasks.The surrounding rocks of the tunnel are mostly strongly weathered rocks with developed joints and fissures,rock fracturing and high groundwater level.The surrounding rocks are mainly of Class IV and V,and most of them are of Class V.The tunnel-forming conditions are poor.In order to ensure the progress and quality of the project,excavation by excavator method has achieved good results.The tunnel excavator method is summarized and analyzed to facilitate the subsequent excavation of long-distance small-section tunnel by the excavator method.
分 类 号:TV554.2[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.190.207.23