油改煤锅炉燃烧优化研究  被引量:2

Research on Optimization of Oil-to-Coal Boiler Combustion

在线阅读下载全文

作  者:关风一 宋金礼 赵阳 李含琼 王博 GUAN Fengyi;SONG Jinli;ZHAO Yang;LI Hanqiong;WANG Bo(Liaoning Dongke Electric Power Co.,Ltd.,Shenyang,Liaoning 110179,China)

机构地区:[1]辽宁东科电力有限公司,辽宁沈阳110179

出  处:《东北电力技术》2023年第3期45-48,51,共5页Northeast Electric Power Technology

摘  要:分析了某电厂油改煤锅炉前墙冷灰斗区域频繁发生水冷壁爆管现象的原因,根据现象分别进行了变二次风试验、不均等配风试验、煤粉倒塔型分配试验及变煤气喷嘴投运方式试验。经过一系列燃烧优化调整,结果表明,采用合理的二次风配比、煤粉量分配以及煤气喷口组合投运措施,对缓解冲刷水冷壁引起的爆管效果显著。It analyzes the reasons why the water wall pipe burst frequently in the cold ash bucket area of the front wall of the oil-to-coal boiler in a power plant.According to the phenomenon,the variable secondary air test,the unequal air distribution test,the coal powder inverted tower distribution test,and the operation test of the variable gas nozzle are carried out respectively.Through a series of combustion optimization and adjustment tests,the results show that making use of the reasonable secondary air ratio,coal powder distribution and combined operation measures of gas nozzle have significant effect on relieving the pipe burst caused by flushing water wall.

关 键 词:锅炉 油改煤 冷灰斗 爆管 

分 类 号:TM621[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象