检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王岩松 韩星[1] 陈春[1] 鲁金[1] WANG Yansong;HAN Xing;CHEN Chun;LU Jin(Xi’an Electronic Engineering Research Institute,Xi’an 710100)
出 处:《火控雷达技术》2023年第1期100-109,共10页Fire Control Radar Technology
摘 要:针对相控阵火控雷达多任务调度时的资源分配问题,提出一种综合优先级下的自适应调度算法。基于相控阵火控雷达需与高炮配合对待拦截目标进行火力打击的特性,进行目标射击有利度求解。利用两级二维优先级表级联的思想,结合目标射击有利度、工作方式优先级和任务截止期进行综合优先级规划。以加权时间偏移量平方和最小作为调度代价准则,构建任务调度代价模型,提出带有时间窗的一步回溯法与插空法相结合的自适应调度算法,并利用该算法求解调度模型。通过仿真将本文所提调度算法与传统工作方式优先级加截止期调度算法进行对比分析,结果表明:相比传统调度算法,本文所提调度算法提升了射击价值率,降低了平均时间偏移率和调度代价。An adaptive scheduling algorithm based on comprehensive priority is proposed to address the problem of resource allocation in multi-task scheduling of phased-array fire control radar.Given that phased-array fire control radar needs to cooperate with anti-aircraft guns to attack the targets,the firing favorability is solved.Using the idea of two-level two-dimensional priority list cascade,the comprehensive priority planning is carried out with the firing favorability,working mode priority,and task deadline being taken into consideration.Taking the minimum sum of squares of weighted time offsets as the scheduling cost criterion,a task scheduling cost model is constructed,and an adaptive scheduling algorithm combining one-step backtracking method with time window and space insertion method is proposed.In addition,the algorithm is used to solve the scheduling model.The proposed scheduling algorithm is compared with the traditional scheduling algorithm employing working mode priority and deadline through simulation.The results show that the proposed scheduling algorithm has higher firing value rate and lower average time offset rate and scheduling cost.
关 键 词:相控阵火控雷达 射击有利度 综合优先级 自适应调度 及时性
分 类 号:TN958.92[电子电信—信号与信息处理]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.226.251.231