检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张宏伟 Zhang Hongwei(Shanxi CoKing Coal Group Huajin CoKing Coal Longfeng Coal Industry Co.,Ltd.,Fenyang Shanxi 032200)
机构地区:[1]山西焦煤华晋焦煤龙峰煤业有限公司,山西汾阳032200
出 处:《现代工业经济和信息化》2023年第2期264-265,267,共3页Modern Industrial Economy and Informationization
摘 要:根据矿井水文地质条件和实际情况,分析9号煤层上覆3号煤采空区积水和K5、K6灰岩含水层富水性,设计疏放水钻孔,在9号煤层工作面顺槽布置钻场,钻孔窜层通过K_(5)、K_(6)灰岩,终孔探至3号煤层采空区,探测并疏放含水层及空区积水,有效消除了9号煤层顶板含水层和上覆3号煤层采空区积水对矿井安全生产的水害威胁。According to the hydrogeological conditions and actual situation of the mine,the ponding in the overlying No.3 coal goaf of No.9 coal seam and the water abundance of K5 and K6 limestone aquifers are analyzed,and the drainage boreholes are designed.The drilling yard is arranged along the channel in the worKing face of No.9 coal seam.The drilling channeling passes through K5 and K6 limestone,and the final hole is explored to the goaf of No.3 coal seam to detect and drain the ponding in the aquifer and goaf.The No.9 coal seam roof aquifer and the ponding in the overlying No.3 coal seam goaf have effectively eliminated the threat of water damage to mine safety production.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49