赤水河红军大桥主桥钢桁梁安装缆索吊机设计  被引量:1

Design of Cableway Crane Used to Install Steel Truss Girder of Chishui River Red Army Bridge

在线阅读下载全文

作  者:李武 周兴均 LI Wu;ZHOU xing-jun(Wuhan Bridge and Building Works Supervision Co.,Ltd.,Wuhan 430034,China;Sichuan Road&Bridge Huadong Construction Co.,Ltd.,Chengdu 610299,China)

机构地区:[1]武汉桥梁建筑工程监理有限公司,湖北武汉430034 [2]四川路桥华东建设有限责任公司,四川成都610299

出  处:《世界桥梁》2023年第S01期97-103,共7页World Bridges

摘  要:古蔺至习水段高速赤水河红军大桥主桥为主跨1200 m的双塔单跨钢桁梁悬索桥,全桥钢桁梁共分81个节段,标准节段重240 t。由于山区大件运输困难、桥址地势落差大、峡谷地区无通航能力、现场施工便道狭窄等条件的限制,采用缆索吊机法安装钢桁梁节段。结合现场既有结构与布置,缆索吊机跨径布置设计为(309.78+1200+196.179)m,设计吊重240 t,并考虑3倍安全系数,包括主索、起吊索、牵引索、跑车系统、转索系统和锚固系统等,同时设置主体结构监测、视频监控系统、集中操控系统等信息化系统,保证大跨长距离缆索吊机系统的安全运行。经计算各工况下主索、起吊索和牵引索安全系数均满足规范要求,各构件受力满足要求。整个架梁过程中,缆索吊机运行平稳,用时3个月完成了全桥81个钢桁梁节段安装工作。The main bridge of Chishui River Red Army Bridge carrying a section of the Gulin-Xishui Expressway is a two-tower suspension bridge with a main span of 1200 m.The hanger cables are only arranged in the main span.The stiffening girder consists of 81 steel truss segments,and a standard segment weighs 240 t.Due to the challenges of limited large cargo transportation access in the mountainous area,large distance from the bridge deck to the underneath river surface,non-navigable valley and narrow construction trestles at bridge site,the steel trusses were determined to erect using a cableway crane system.Considering the locations of the surrounding existing structures as well as three times of safety factors,the cableway crane system contains three spans of 309.78,1200 and 196.179 m,with a design hoisting capacity of 240 t.The system consists of main cables,hoisting cables,hauling cables,trolleys,cable deviators and anchoring system,together with the digitalized management systems,including structural monitoring,video monitoring and control system and centralized control system,to ensure the safe operation of the long-span and long-distance cableway crane system.The calculations indicate that the safety factors of the main cables,hoisting cables and hauling cables under different loading conditions can meet the code requirements,and all the structural components reach the required load bearing levels.The cableway crane system worked smoothly,and the installation of all the 81 steel truss segments cost 3 months.

关 键 词:山区桥梁 悬索桥 钢桁梁 缆索吊机 缆索吊机跨径 吊重 智能监测系统 吊机设计 

分 类 号:U448.25[建筑科学—桥梁与隧道工程] U445.38[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象