检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李兵 Li Bing(China Railway Wuhan Survey and Design&Institute Co.,Ltd.,Wuhan 430074,China)
机构地区:[1]中铁武汉勘察设计院有限公司,湖北武汉430074
出 处:《山西建筑》2023年第8期140-144,共5页Shanxi Architecture
基 金:国家铁路局科技与法规司科研课题(KFJF2019-094)。
摘 要:铁路接轨方案是铁路专用线前期方案研究的重点,以岳阳铁水集运煤炭储备铁路项目为例,介绍了接轨方案选择考虑的各方面因素,通过对各方案进行综合比选,最终选择经济合理、技术可行的相对最优方案,使该铁路工程达到技术可行、经济合理的目标。The railway connection scheme is the focus of the preliminary scheme research of the railway dedicated line.Taking the Yueyang railway-water combined transportation coal reserve railway project as an example,this paper introduces various factors considered in the selection of the connection scheme,and finally selects the relatively optimal scheme that is economically reasonable and technically feasible through comprehensive comparison and selection of each scheme,so that the railway project can reach the goal of technically feasible and economically reasonable.
分 类 号:TU248.1[建筑科学—建筑设计及理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15