岳阳铁水集运煤炭储备项目接轨方案研究  

Study on railway connection scheme of Yueyang rail-water intermodal transportation coal reserve project

在线阅读下载全文

作  者:李兵 Li Bing(China Railway Wuhan Survey and Design&Institute Co.,Ltd.,Wuhan 430074,China)

机构地区:[1]中铁武汉勘察设计院有限公司,湖北武汉430074

出  处:《山西建筑》2023年第8期140-144,共5页Shanxi Architecture

基  金:国家铁路局科技与法规司科研课题(KFJF2019-094)。

摘  要:铁路接轨方案是铁路专用线前期方案研究的重点,以岳阳铁水集运煤炭储备铁路项目为例,介绍了接轨方案选择考虑的各方面因素,通过对各方案进行综合比选,最终选择经济合理、技术可行的相对最优方案,使该铁路工程达到技术可行、经济合理的目标。The railway connection scheme is the focus of the preliminary scheme research of the railway dedicated line.Taking the Yueyang railway-water combined transportation coal reserve railway project as an example,this paper introduces various factors considered in the selection of the connection scheme,and finally selects the relatively optimal scheme that is economically reasonable and technically feasible through comprehensive comparison and selection of each scheme,so that the railway project can reach the goal of technically feasible and economically reasonable.

关 键 词:铁路 接轨方案 车站改造 

分 类 号:TU248.1[建筑科学—建筑设计及理论]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象