检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:马丽威 Ma Liwei(Shanxi Coking Coal Fenxi MiningZhengshan Coal Industry,Xiaoyi Shanxi 032300)
机构地区:[1]山西焦煤汾西矿业正善煤业,山西孝义032300
出 处:《机械管理开发》2023年第3期261-263,共3页Mechanical Management and Development
摘 要:近距离煤层群下部煤层开采时会受到上覆煤层影响而使顶板裂隙发育,且当上覆煤层采空区内留设有区段煤柱时容易引起应力集中,给下覆煤层巷道掘进及回采带来制约。以山西某矿开采的5号煤层5201综采工作面回采巷道为研究对象,采用数值模拟技术合理确定回采巷道布置位置,并依据现场情况提出围岩支护方案。将设计好的支护方案应用后表明,巷道围岩变形量整体较小,可满足掘进及后续回采需求。When mining the lower coal seam of the close coal seam group,the overlying coal seam will affect the development of roof fissures,and when there is a section of coal column in the overlying coal seam mining area,it is easy to cause stress concentration,which brings constraints to the lower coal seam roadway digging and back mining.The return roadway of the No.5 coal seam 5201 comprehensive mining working face of a mine in Shanxi Province is taken as the object of study.Numerical simulation techniques are used to reasonably determine the return roadway layout and propose a rock support scheme based on the site conditions.The designed support scheme was applied to show that the overall deformation of the surrounding rock of the roadway was small and could meet the requirements of digging and subsequent retrieval.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.147