马堡煤业大采高工作面预掘回撤通道掩护式支架支护探讨  被引量:3

Discussion on Covered Bracket Support for Pre-excavation and Retraction Channel of Large Mining Height Working Face in Mapao Coal Industry

在线阅读下载全文

作  者:常书清 Chang Shuqing(Shanxi Mabao Coal Industry Co.,Ltd.,Changzhi Shanxi 046399)

机构地区:[1]山西马堡煤业有限公司,山西长治046399

出  处:《机械管理开发》2023年第3期287-289,共3页Mechanical Management and Development

摘  要:为提升综采工作面液压支架的回撤速度和效率,保障煤矿的生产效率和能力,以15202综采工作面为研究对象在对其地质条件分析的基础上,采用KJ-327液压支架压力监测系统对工作面的矿压显现规律进行实测,为后续支护提供数据支撑。采用临时和永久支护相结合的方式对15202回撤通道进行有效支护,保证液压支架能够高效、顺利回撤。In order to improve the retraction speed and efficiency of the hydraulic brackets at the comprehensive mining face,and to guarantee the productivity and capacity of the coal mine,the 15202 comprehensive mining face is used as an example on the basis of the analysis of its geological conditions;the KJ-327 hydraulic bracket pressure monitoring system is used to measure the mine pressure manifestation pattern at the working face,and to provide data support for the subsequent support.Finally,a combination of temporary and permanent support was used to effectively support the 15202 retreat channel to ensure that the hydraulic support could be retracted efficiently and smoothly.

关 键 词:掩护式液压支架 回撤通道 压力监测系统 矿压显现 联合支护 

分 类 号:TD323[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象