液态燃料钍基熔盐实验堆主体装置厂房总体布置研究  

Study on General Layout of Main Plant Building of Thorium-Based Molten Salt Experimental Reactor with Liquid Fuel

在线阅读下载全文

作  者:贝晨 贾小攀 薛静 王振中 Bei Chen;Jia Xiaopan;Xue Jing;Wang Zhenzhong(China Nuclear Power Engineering Co.,Ltd.,Beijing,100840,China)

机构地区:[1]中国核电工程有限公司,北京100840

出  处:《核动力工程》2023年第2期210-215,共6页Nuclear Power Engineering

摘  要:为实现2 MW液态燃料钍基熔盐实验堆(TMSR)主体装置厂房的合理紧凑型总体布置设计,本研究根据熔盐堆堆型特征、顶层设计和系统功能需求,确定了主体装置厂房总体设计特征,探讨了TMSR关键设备及物项的相对位置特点;同时通过合理规划厂房功能分区和设备布置,最终得到了该厂房的总体布置方案。通过本项目的实施,为实现TMSR的系统集成以及验证提供了基础平台,为小型模块化钍基熔盐示范堆的设计和建设提供技术支持及经验。In order to realize the reasonable and compact general layout of the main plant building for 2 MW thorium based molten salt experimental reactor(TMSR)with liquid fuel,the overall design characteristics of the main plant building are determined in this paper according to the type characteristics,top-level design and system functional requirements of the molten salt reactor,and the relative position characteristics of the key equipment and items of TMSR are discussed.Besides,the general layout scheme of the plant is finally obtained through reasonable planning of the functional zoning and equipment layout of the plant.Through the implementation of this project,it provides a basic platform for the system integration and verification of TMSR and provides technical support and experience for the design and construction of small modular thoriumbased molten salt demonstration reactor.

关 键 词:钍基熔盐实验堆(TMSR) 主体装置厂房 总体布置 

分 类 号:TL48[核科学技术—核技术及应用]

 