检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周信 ZHOU Xin(The Fourth Engineering Co.,Ltd.of China Railway 25th Bureau Group,Liuzhou 545007,China)
机构地区:[1]中铁二十五局集团第四工程有限公司,柳州545007
出 处:《价值工程》2023年第10期96-99,共4页Value Engineering
摘 要:本文结合宾南高速公路茨坪枢纽立交上跨广大铁路转体桥工程连续刚构施工过程中,高墩托架现浇0#块采用千斤顶张拉反压措施,达到常规堆载预压效果工程实例,通过托架设计验算、现场监控监测等,得出该措施能很好地满足现场安全、进度等管理目标要求。具有较好的推广使用实际意义。This article combines the continuous rigid frame construction process of the continuous rigid frame bridge project of the Ciping Junction Interchange on Binnan Expressway,in which the cast-in-situ 0#block of the high pier bracket was tensioned and backpressed with jacks,achieving the effect of conventional surcharge preloading.Through the bracket design verification,on-site monitoring,and other aspects,it is concluded that this measure can well meet the requirements of on-site safety,progress,and other management objectives.It has good practical significance for promotion and use.
分 类 号:U445.3[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.124.142