检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王晓龙
机构地区:[1]中铁建大桥工程局集团第四工程有限公司,哈尔滨150000
出 处:《科技创新与应用》2023年第11期156-159,共4页Technology Innovation and Application
摘 要:随着市政工程建设的不断发展,大型构筑物(包括住宅、厂房、大门和保护建筑等)需整体平移的需求不断增加,相应的平移技术也在逐渐成熟。大型构筑物整体平移技术既解决构筑物迁移问题,又能缩短工期、降低成本,保证构筑物完整性,对于构筑物的保护是其他方法无法企及的,具有一定的发展前景。该文通过具体实例分析构筑物整体平移技术的过程及注意事项,希望给相关人士提供借鉴。With the development of municipal engineering construction,large-scale structures(including houses,factories,gates and protective buildings)need to be moved as a whole.The technology of integral translation of large-scale structure can not only solve the problem of structure migration,but also shorten the construction period,reduce the cost and ensure the integrity of the structure,it has certain development prospect.This paper analyzes the process of the whole structure translation technology and points for attention through specific examples,hoping to provide reference for relevant people.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171