峰峰矿区突水特点及定向水平井封堵技术研究  被引量:4

Study on Characteristic of Water Inrush and Plugging Technology of Horizontal Directional Drilling in Fengfeng Mining Area

在线阅读下载全文

作  者:李江华 王铁记[3] 黎灵[1,2] 靳子栋 LI Jianghua;WANG Tieji;LI Ling;JIN Zidong(Mine Safety Technology Branch of China Coal Research Institute,Beijing 100013,China;State Key Laboratory of Coal Mining and Clean Utilization,China Coal Research Institute,Beijing 100013,China;Jizhong Energy Fengfeng Group Co.,Ltd.,Handan 056107,China)

机构地区:[1]煤炭科学技术研究院有限公司安全分院,北京100013 [2]煤炭资源高效开采与洁净利用国家重点实验室(煤炭科学研究总院),北京100013 [3]冀中能源峰峰集团有限公司,河北邯郸056107

出  处:《煤炭技术》2023年第3期160-166,共7页Coal Technology

基  金:国家自然科学基金资助项目(51804162)。

摘  要:煤矿底板突水常采用注浆封堵治理方法,而受开采历史技术条件的限制,遗留了很多传统方法无法封堵的突水点,时刻威胁矿井的安全生产。基于峰峰矿区的水文地质特征,对各突水点进行分类,分析突水的主要影响因素。通过数值分析和现场实践,研究了灰岩含水层浆液扩散规律,确定了适合峰峰矿区的堵水材料参数。研究表明,峰峰矿区突水事故由多种因素耦合作用引起,主要突水水源为大青灰岩水和奥陶系灰岩水,大型及特大型突水占比接近50%;突水通道以底板采动裂隙和正断层断裂带为主,采用定向水平井封堵时,水平段应距断层面小于30 m,充填骨料粒径范围宜为1~40 mm。提出的水平井“查—钻—注—检”快速封堵突水点方法应用于牛儿庄矿特大型突水点残余水量治理中,彻底有效封堵了突水通道,为我国大水矿区老突水点的高效封堵治理提供了技术手段。Grouting treatment method is often used to plug the water inrush pathway for water inrush accidents from coal seam floor. However, many old water inrush areas cannot be plugged through traditional methods effectively. Water inrush area threats mining safety of coal mine momently. Based on the hydrogeological characteristics of Fengfeng coal mining area, water inrush areas were classified and the main factors of water inrush were also analyzed. Through numerical analysis and filed practice,diffusion range of grouting and grouting effect were researched under different space between horizontal drillings and aggregate size was confirmed for water plugging and treatment in Fengfeng coal mining area. The research results showed that water inrush accidents caused by coupling of high pressure water. Sources of water inrush were from Daqing limestone and Ordovician limestone, the proportion of large and super-huge water inrush accidents was near 50%. Mining floor fractures and normal faults were the main water inrush pathways. When the fault pathway was grouted through horizontal directional drilling, the distance between horizontal drilling and fault face should be less than 30 m and the particle size of filling aggregate should be 1 to 40 mm. Based on searching, drilling, grouting and checking, horizontal directional drilling treatment method was proposed and was used to govern remnant water inflow of super-huge water inrush in Niuerzhuang coal mine. Water inrush pathway was completely plugged after checking evaluation, which supplied technological means for the treatment of old water inrush area.

关 键 词:突水类型 突水因素 定向水平井 封堵治理 

分 类 号:TD745[矿业工程—矿井通风与安全]

 