检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Fenling Feng Junjie Jia Ailan Liang Chengguang Liu
机构地区:[1]School of Traffic and Transportation Engineering,Central South University,Changsha 410075,Hunan,China [2]Rail Data Research and Application Key Laboratory of Hunan Province,Central South University,Changsha 410075,Hunan,China.
出 处:《Transportation Safety and Environment》2022年第3期18-31,共14页交通安全与环境(英文)
基 金:the National Social Science Founda-tion of China(Grant No.18BJY169);the Science and Technol-ogy Project of China National Railway Group Corporation Limite(Grant No.P2021X013).
摘 要:The operation of the China Railway Express features numerous links across several regions and countries. Effectively controlling therisks involved in the operation of the China Railway Express is crucial for ensuring safety and efficiency and promoting the sustainabledevelopment of the China Railway Express. The Bayesian network-based risk-management model was built corresponding to theactual operation of the China Railway Express;the model used an advanced risk-management theory. The sensitivity analysis of riskfactors and Bayesian network inference were realized using the expectation-maximization and clique-tree propagation algorithms.Using the risk-checklistmethod, 17 risk-related factors were analysed on 17 nodes of the Bayesian network fromthree perspectives—safety, efficiency and effectiveness—based on expert opinions and the actual operating conditions of the China Railway Express.Data from a sensitivity analysis and evidence inference of the Bayesian network model indicated that the sensitivity coefficients ofnodes N01, N04, N07, N08 and N17 of the network were high. Moreover, the risk-occurrence probabilities for nodes N01, N04, N06,N07 and N09 were higher in the case of reverse inference. Our results revealed the crucial factors influencing the risk. The identifiedrisk factors included the stability of the political environment in countries along the route, conditions of station infrastructures andthe complexity of the process of changing rails and reloading. Further, risk-management suggestions were provided. By establishinga sound risk-management framework, reliable assessment and management could be realized in accordance with changes in theoperating conditions of the China Railway Express.
关 键 词:Risk evaluation Bayesian network China railway express risk-management suggestion
分 类 号:U294.1[交通运输工程—交通运输规划与管理] F125[交通运输工程—道路与铁道工程] F532[经济管理—世界经济]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15