平塘特大桥主塔斜拉索安装技术分析  

Technical Analysis of the Installation of Stay Cables for the Main Tower of Pingtang Bridge

在线阅读下载全文

作  者:谢日红 Xie Rihong(Liuzhou Ovm Engineering Co.,Ltd.,Liuzhou,China)

机构地区:[1]柳州欧维姆工程有限公司,广西柳州

出  处:《科学技术创新》2023年第7期188-191,共4页Scientific and Technological Innovation

摘  要:斜拉索承担了斜拉桥大部分荷载,斜拉索的安装成为斜拉桥建设的关键。因此,结合平塘特大桥主塔斜拉索安装工程实例,重点介绍了该桥斜拉索安装工序流程与安装技术,为斜拉桥斜拉索的安装提供参考。The cable bears most of the load of the cable-stayed bridge,and the installation of the cable becomes the key to the construction of the cable-stayed bridge.Therefore,focuses on the installation process flow and installation technology of the stay cables of the main tower of Pingtang Grand Bridge,combining with the example of the installation project of the stay cables of the main tower,to provide a reference for the installation of the stay cables of the cable-stayed bridge.

关 键 词:斜拉桥 斜拉索 安装 

分 类 号:U441[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象