作 者:杨毅君 YANG Yijun(Huipodi Coal Mine,Shanxi Fenhe Coking Coal Co.,Ltd.,Hongtong 041600,Shanxi,China)
机构地区:[1]山西汾河焦煤股份有限公司回坡底煤矿,山西洪洞041600
出 处:《能源与节能》2023年第4期160-162,共3页Energy and Energy Conservation
摘 要:金能煤业回风立井在80~217m段出现了透水点,已经严重影响到立井的正常使用。为了保证回风立井的安全使用,需要对井筒实施注浆堵水工程。针对回风立井的实际情况,采用了壁后帷幕深浅孔注浆+壁间浅孔注浆综合治理的方案。详细地介绍了注浆施工参数、设备和施工工艺。经过计算,注浆压力不超过4.75MPa,单孔注入浆液量为0.46m3。此次理论研究可以为实际中井筒透水治理提供一定的参考。In Jinneng Coal Industry Co.,Ltd.,water permeable point appeared in 80-217 m air return shaft,which had seriously affected the normal operation of the shaft.In order to ensure the safe use of air return shaft,it is necessary to implement the shaft grouting water plugging project.According to the actual situation of the air return shaft,the comprehensive treatment scheme of deep and shallow hole grouting of curtain behind wall+shallow hole grouting between walls was adopted.This paper introduced the construction parameters,equipment and technology of grouting in detail.After calculation,the grouting pressure does not exceed 4.75 MPa,and the grouting volume of single hole is 0.46 m3.This theoretical study can provide some reference for the actual treatment of wellbore permeability.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7