检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:钟伟泉 ZHONG Weiquan(Guangdong Zhonghao Survey and Design Consulting Co.,Ltd.,Guangzhou 510700,China)
机构地区:[1]广东中灏勘察设计咨询有限公司,广东广州510700
出 处:《水电与新能源》2023年第4期46-51,共6页Hydropower and New Energy
摘 要:为较经济解决某些小型水库均质土坝的严重渗漏问题,借鉴锥探灌浆技术在堤防防渗广泛应用经验,结合已实施的工程案例,通过地勘渗透试验分析和渗流稳定分析其合理性,并提出了实施要点:建议在水库坝高不大于20 m均质土坝,渗透系数、压实度均不满足土石坝设计规范要求且坝体渗漏量不大情况下,采用锥探灌浆技术较为适宜;灌浆应在坝前水位降至死水位后实施;应根据大坝的地勘报告、坝高和坝体渗流量等因素综合确定施工参数;施工中应设置大坝变形观测断面,实时监测大坝位移、沉降和检查变形、裂缝及冒浆情况。In order to economically solve the serious leakage problem of homogeneous earth dams in some small reservoirs,the experience of extensive application of the cone drilling grouting technique in anti-seepage treatment of embankment is summarized.Based on practical engineering cases,the rationality of the technique is verified with geological exploration permeability tests and seepage stability analysis.Also,the key implementation points of the technique are concluded.It is recommended that the cone drilling grouting technique is more suitable for homogeneous earth dams with the dam height of no more than 20 m,and the permeability coefficient and compactness do not satisfy the requirements of the design specification,and the dam leakage is not large.The grouting construction should be carried out after the reservoir water level drops to the dead water level.The construction parameters should be determined based on a comprehensive consideration of the geological survey results,the dam height and the leakage flow of the dam body.During the grouting construction,dam deformation observation sections should be arranged to monitor the dam displacement and settlement and inspect the deformation,cracks and slurry emission conditions in real time.
分 类 号:TV543.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.145.163.51