检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:谭鑫[1,2] 尹心 任亚坤 姚满 黄明华 Tan Xin;Yin Xin;Ren Yakun;Yao Man;Huang Minghua(Institute of Geotechnical Engineering,Hunan University,Changsha 410082,P.R.China;Key Laboratory of Building Safety and Energy Efficiency of the Ministry of Education,Hunan University,Changsha 410082,P.R.China;China Railway Construction Heavy Industry Co.,Ltd.,Changsha 410100,P.R.China)
机构地区:[1]湖南大学土木工程学院,长沙410082 [2]湖南大学建筑安全与节能教育部重点实验室,长沙410082 [3]中国铁建重工集团股份有限公司,长沙410100
出 处:《地下空间与工程学报》2023年第1期69-78,共10页Chinese Journal of Underground Space and Engineering
基 金:湖南创新型省份建设专项经费(2019GK1010);创新平台与人才计划湖湘高层次人才聚集工程创新团队(2019RS1030);国家重点研发计划(2019YFC1511100)。
摘 要:基于复合岩体方法考虑锚杆与围岩的相互作用,在引入加锚效应不均匀性基础上,根据对围岩变形约束程度修正复合岩体等效计算刚度,获得了锚杆支护作用下圆形隧道收敛变形的修正解。对比既有解及数值结果验证了本文解的正确性,修正解合理地降低了既有计算方法对锚杆约束效果的过高估计。结果表明:锚杆通过提高复合围岩等效刚度降低隧道收敛变形;增加锚杆密度比增加锚杆长度对降低隧道收敛更为有效;在常规锚杆布置参数条件下,锚杆支护对隧道最终收敛的降低幅度不会超过20%,难以完全依靠系统锚杆来限制软岩隧道的收敛大变形。本文提出的修正解能合理反映锚杆对围岩收敛变形的约束作用,可为锚杆支护下隧道收敛变形的量化分析提供简洁准确的计算方法。This paper investigates the interaction between bolts and surrounding rock mass and introduces the inhomogeneity of the boltsreinforcement effect.This study is based on the homogenized composite rock mass method.The equivalent stiffness calculation method of composite rock mass is modified according to its degree of restraint on the deformation of the composite rock mass to obtain the modified solution of convergence deformation of a circular tunnel under the bolt reinforcement.The correctness of the modified solution is verified by comparing it with the existing solution and numerical analysis results.The modified solution reasonably reduces the overestimation of the bolt restraint effect by the previous composite rock stiffness calculation method.The analysis using the modified solution shows that:the bolt support reduces the tunnel convergence deformation by increasing the equivalent stiffness of the composite rock;it is more effective to reduce the tunnel convergence by increasing the bolt density than by increasing the bolt length;under the regular bolt arrangement,the reduction of the final tunnel convergence by bolts does not exceed 20%,and it is not easy to rely entirely on system bolts to limit the convergence deformation of tunnels in soft rock mass.The modified solution proposed in this paper can reasonably reflect the restraining effect of bolts on the convergence deformation of the surrounding rock,and it can provide a concise and accurate calculation method for the quantitative analysis of the tunnel convergence deformation under bolt support.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38