检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:万彦志 WAN Yan-zhi(Sichuan Highway Planning,Survey,Design and Research Institute Ltd.,Chengdu 610041,China)
机构地区:[1]四川省公路规划勘察设计研究院有限公司,成都610041
出 处:《工程建设与设计》2023年第6期240-242,共3页Construction & Design for Engineering
摘 要:公路隧道的造价编制和公路沿线路基、路面、桥梁涵洞等构造物的造价编制不同,有其自身的特点。论文以G351线夹金山隧道初步设计概算、施工图设计预算编制为例,就公路隧道工程在初步设计阶段和施工图设计阶段造价编制采用的定额不同时,编制过程中应注意的问题和其他工程费、措施费的定额取费类别选择注意事项进行阐释。The cost compilation of highway tunnel is different from that of subgrade,pavement,bridge culvert and other structures along the highway,and has its own characteristics.The paper takes the preliminary design budget estimate and construction drawing design budget of Jinshan Tunnel on G351 Line as an example,explains the problems that should be paid attention to in the process of preparing the highway tunnel project and the matters that should be paid attention to in the selection of other engineering fee and measure fee quota collection category when the quota is different in the preliminary design stage and construction drawing design stage.
分 类 号:U452[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49