十三陵抽水蓄能电站压力钢管充排水分析  被引量:1

Analysis of penstock filling and draining in Shisanling pumped storage power station

在线阅读下载全文

作  者:翟洁 张毅 张湲 ZHAI Jie;ZHANG Yi;ZHANG Yuan(Beijing Shisanling Pumped Storage Power Station of State Grid Xinyuan Group Co.,Ltd)

机构地区:[1]国网新源控股有限公司北京十三陵蓄能电厂,北京102200

出  处:《大坝与安全》2023年第1期44-49,共6页Dam & Safety

摘  要:十三陵抽水蓄能电站高水头、大HD值地下埋藏式压力钢管已运行二十多年,且运行环境复杂,充排水风险较大。对2017、2018年压力钢管充排水开展分析,通过复核放空工况相关参数,分析压力钢管运行期和充排水期间的结构应力、外水压力等监测数据,综合评判结果显示压力钢管结构运行状况良好。The buried penstock with high head and large HD in Shisanling pumped storage power sta⁃tion has been in operation for more than twenty years,and the operation environment is complex,with high risk during filling and draining period.The analysis of the penstock filling and draining in 2017 and 2018 was carried out.By reviewing the parameters related to the emptying condition,the monitoring data of structural stress and external water pressure during the operation period and the filling and drain⁃ing period was analyzed.The comprehensive evaluation results showed that the penstock structure was in good operating condition.

关 键 词:抽水蓄能 地下埋藏式压力钢管 充排水 

分 类 号:TV732[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象