检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵利锋 ZHAO Lifeng(Management Bureau of Luan River Diversion Project,Haihe River Water Conser-vancy Commission,MWR)
机构地区:[1]水利部海河水利委员会引滦工程管理局,河北唐山064300
出 处:《大坝与安全》2023年第1期64-67,共4页Dam & Safety
摘 要:大黑汀水库已建成运行40多年,主坝坝基总渗流量由坝体廊道内分区渗流量求和得到。由于坝体内渗流较分散,分区监测点未能监测到全部渗流量,因此现有监测数据不能完全反映坝基总渗流量,影响渗流量监测数据分析。为解决该问题,监测了坝体内集水井水位变化和集水井强制排向下游水量,求得了坝基总渗流量,满足监测要求,提高了工程管理水平。Daheiting reservoir has been in operation for more than 40 years.The total seepage in main dam foundation is obtained from the sum of regional seepage in dam gallery.Because the dam seepage is relatively scattered,the total seepage can't be obtained by regional monitoring points.Therefore,the ex⁃isting monitoring data can not exactly reflect the total seepage,which affects the analysis of seepage data.To solve this problem,the total seepage in dam foundation can be obtained by monitoring the water level change in water collecting wells and the amount of water forcibly discharged from water collecting wells to downstream,which meets the monitoring requirements and improves the project management level.
分 类 号:TV698.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.188.123.155