新建投资收益型移民后期扶持项目财务可行性分析  

Financial Feasibility Analysis of Post-Stage Supporting Project for New-built Investment-Income Migrants

在线阅读下载全文

作  者:李文明 施满 LI Wen-ming;SHI Man(Yunnan Migration Development Technical Service Center,Kunming 650051,China)

机构地区:[1]云南省移民开发技术服务中心,云南昆明650051

出  处:《云南水力发电》2023年第4期22-26,共5页Yunnan Water Power

摘  要:“投资收益”型后期扶持项目实施的目的在于获取经济收益,在提高移民的经济收入。项目前期成果质量对于拟建项目的成败起着较大的作用,而项目的财务可行性分析又是可行性研究的关键内容,项目可行性和经济合理性分析研究显得尤为重要。结合案例简要阐述了新建“投资收益”型后期扶持项目的财务可行性分析。The purpose of investment-income type late support project implementation is to obtain economic benefits and improve the economic income of migrants.The quality of pre-project results plays an important role in the success or failure of the proposed project,and the financial feasibility analysis of the project is the key content of the feasibility study,so the study of project feasibility and economic rationality is particularly important.This paper briefly elaborates the financial feasibility analysis of the new investment-income type late support project with a case.

关 键 词:水库移民 后期扶持项目 投资收益 财务分析 

分 类 号:D632.4[政治法律—政治学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象