检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李维安 LI Wei-an(Ningbo Municipal Engineering and Construction Group Co.,Ltd.,315002,Ningbo,Zhejiang,China)
机构地区:[1]宁波市政工程建设集团股份有限公司,浙江宁波315002
出 处:《建筑技术》2023年第7期801-803,共3页Architecture Technology
摘 要:嘉兴市区中环快速路新建高架龙凤桥通过利用既有的预应力混凝土梁桥作为临时支架承重平台,合理设计吊装块段、吊装顺序和临时支架,架桥机架设钢箱梁,解决了新建龙凤桥受桥位空间限制传统吊装方式难以完成施工的难点,有效降低了施工风险及施工成本,缩短了施工周期,为今后类似架设钢箱梁桥施工技术提供参考。For the new Longfeng Overpass of the central expressway in Jiaxing,the existing prestressed concrete girder bridge is used as a temporary support bearing platform,the hoisting sections,hoisting sequence and temporary support are designed rationally,and the steel box girder is erected with a bridge erecting machine.This solves the problem that the conventional hoisting cannot be performed easily as a result of spatial restraints of the new Longfeng Overpass,effectively reduces construction risks and construction costs,and shortens the construction period,thus providing a reference for the construction of similar steel box girder bridges in the future.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.219.40.177