检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈泉林 程鹏跃 章建明 王坤 Chen Quan-lin;Cheng Peng-yue;Zhang Jian-ming;Wang Kun
机构地区:[1]浙江省建投交通基础建设集团有限公司,杭州310012
出 处:《建筑技术开发》2023年第4期65-67,共3页Building Technology Development
摘 要:针对山区半挖半填路基交界面问题开展研究,简述了山区半挖半填路基土工格栅加筋的种类,并对山区半填半挖各类型土工格栅加筋作用和机理进行探究和分析。同时,结合某典型山区半挖半填路基案例建立数值模型探究不同的土工格栅加筋层数、格栅条的铺设间距等对山区填挖交界面的加筋效果,为山区半挖半填路基交界面多层加筋提供重要的工程指导价值。This paper studies the interface between semi-excavated and semi-filled subgrades in mountainous areas,briefly describes the types of geogrid reinforcement for semi-excavated and semi-filled subgrades in mountainous areas,and explores the effect and mechanism of geogrid reinforcement for semi-excavated and semiexcavated geogrids in mountainous areas.At the same time,a numerical model was established based on a typical case of semi-excavated and semi-filled subgrade in a typical mountainous area to explore the reinforcement effect of different geogrid reinforced layers and laying spacing of grid bars on the interface between fill and excavation in mountainous areas.Multi-layer reinforcement at the interface of semi-filled subgrade provides important engineering guidance value.
分 类 号:TU74[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.74