检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:段增光 DUAN Zengguang(Shanxi Metallurgical Geotechnical Engineering Investigation Co.,Ltd.,Taiyuan 030000,China)
机构地区:[1]山西冶金岩土工程勘察有限公司,山西太原030000
出 处:《中国厨卫》2023年第4期76-78,共3页Chinese Kitchen & Bathroom
摘 要:由于勘察方面工作不到位、设计方面的过失和施工方面的不规范等多方面原因,在钻孔灌注桩施工完成后进行承载力检测,经常会出现不满足设计要求的情况,造成灌注桩承载力不足,影响了工程的进展。基于此,总结了灌注桩承载力不足的常见原因,并结合分析结果提出了处理措施,为类似工程灌注桩承载力不足情况提供参考,保证施工的正常进行.Due to various reasons such as inadequate survey,design mistakes and non-standard construction,bearing ca-pacity testing after the completion of bored pile construction often fails to meet the design requirements,resulting in insuf-ficient bearing capacity of bored pile and affecting the progress of the project.Based on this,the common causes of insuffi-cient bearing capacity of cast in place piles,the analysis of test results and treatment measures are summarized to provide reference for the situation of insufficient bearing capacity of cast-in place piles in similar projects and ensure the normal construction.
分 类 号:TU745[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.205