特厚煤层综放工作面预掘撤架通道支护技术实践  被引量:2

Practice of Support Technology for Pre-excavation and Removal of Support in Fully Mechanized Extra-thick Coal Caving Face

在线阅读下载全文

作  者:杨威 Yang Wei(Shanxi Coking Coal Xishan Coal Electricity Group Co.,Ltd.,Taiyuan Shanxi 030053)

机构地区:[1]山西焦煤西山煤电(集团)有限责任公司,山西太原030053

出  处:《晋控科学技术》2023年第1期45-48,共4页Jinneng Holding Science and Technology

摘  要:为有效控制预掘撤架通道围岩变形量,以斜沟煤矿23101综放工作面条件为背景,采用钻孔窥视方法确定了撤架通道区域顶板松动破坏区域,对支护控制对策进行了分析,提出采用高预应力强力锚杆(索)支护与密集木垛联合支护方式支护撤架通道,并进行了实践。根据现场实践结果,预掘撤架通道围岩变形在可控范围内,能够保证撤架的正常使用。In order to effectively control the deformation of the surrounding rock of the pre-excavation and removal channel, taking the conditions of 23101 fully mechanized caving face in Xiegou Coal Mine as the background, the loose and damaged area of the roof in the removal channel area was determined by using the drilling peep method, the support control countermeasures were analyzed. The combined support method of high prestressed strong anchor rod(cable)support and dense wooden pile was proposed to support the removal channel, and the practice was carried out. According to the field practice results, the surrounding rock deformation of the pre-excavation and removal tunnel was within the controllable range, which can ensure the normal use of the removal tunnel.

关 键 词:特厚煤层 撤架通道 钻孔窥视 支护方案 

分 类 号:TD355[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象