检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:于长一 张圣山 于健[1,2,3,4] 曹永华 高潮[1,2,3,4] YU Chang-yi;ZHANG Sheng-shan;YU Jian;CAO Yong-hua;GAO Chao(Tianjin Port Engineering Institute,Co.,Ltd.of CCCC First Harbor Engineering Co.,Ltd.,Tianjin 300222,China;CCCC First Harbor Engineering Co.,Ltd.,Tianjin 300461,China;Key Laboratory of Geotechnical Engineering,Ministry of Communications,Tianjin 300222,China;Key Laboratory of Geotechnical Engineering of Tianjin,Tianjin 300222,China;CCCC Huzhou Investment Development Co.,Ltd.,Huzhou,Zhejiang 313009,China)
机构地区:[1]中交天津港湾工程研究院有限公司,天津300222 [2]中交第一航务工程局有限公司,天津300461 [3]港口岩土工程技术交通行业重点实验室,天津300222 [4]天津市港口岩土工程技术重点实验室,天津300222 [5]湖州中交投资发展有限公司,浙江湖州313009
出 处:《中国港湾建设》2023年第4期54-59,共6页China Harbour Engineering
摘 要:依托港珠澳大桥西人工岛大直径钢圆筒成岛工程,对实际工作状态的大直径钢圆筒土压力进行监测,填补了大直径钢圆筒受力实测数据的空白。通过工程实测大直径钢圆筒土压力,客观地反映了钢圆筒工作状态下的土压力分布形式和分布规律。通过理论计算钢圆筒的主动土压力、静止土压力和被动土压力与实测数据对比,得到了典型钢圆筒的工作状态是稳定的。实测结果为大直径钢圆筒的稳定计算和施工提供了可靠的基础数据。The earth pressure on large-diameter steel cylinders in actual working conditions was monitored based on the island-building project of the west artificial island of Hongkong-Zhuhai-Macao Bridge,filling up the blank in measured data of large-diameter steel cylinders.The measured earth pressure on large diameter steel cylinders in actual works objectively reflects the distribution form and law of earth pressure under the working condition of the steel cylinders.By comparing the theoretically calculated active earth pressure,static earth pressure and passive earth pressure on steel cylinders with the measured data,it is concluded that the working state of typical steel cylinders is stable.The measured results provide reliable basic data for the stability calculation and the construction of large-diameter steel cylinders.
分 类 号:U655.51[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.223.97.46