检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王正邦 WANG Zhengbang(State Key Laboratory of Rail Transit Engineering Informatization(FSDI),Xi’an 710043,China;Shaanxi Railway and Underground Traffic Engineering Key Laboratory(FSDI),Xi’an 710043,China)
机构地区:[1]轨道交通工程信息化国家重点实验室(中铁一院),西安710043 [2]陕西省铁道及地下交通工程重点实验室(中铁一院),西安710043
出 处:《铁道标准设计》2023年第5期6-12,共7页Railway Standard Design
基 金:中铁第一勘察设计院集团有限公司科研资助项目(院科20-09)。
摘 要:风沙灾害威胁着沙区铁路建设运营,由于高速列车具有速度快、车体轻的特点,线路在穿越风沙地带时受到的风沙流威胁更大。为在选线设计时就将线路风沙危害尽可能地减小,通过分析风沙流对高速铁路建设和运营的影响机理,针对风沙地区特殊的自然条件,结合铁路选线基本理论与方法,提出风沙地区高速铁路综合选线原则及风沙流区、戈壁区、大风区的高铁线路选线设计要点。以兰新高铁为例,通过详细勘察风沙区和分析现有资料,从线路走向方案设计、工程投资、环境影响等方面研究风沙地区高速铁路综合选线原则在实际线路工程中的应用,并确定了高速铁路在风沙地区较为合理的线路设计方案。经过兰新高铁多年的实际运营表明:该方法具有较好的工程应用性,可为今后风沙地区高速铁路选线设计提供一定参考。Wind-sand disaster threatens the construction and operation of railway in sandy area.As the high-speed train is swift in speed and light in weight,the railway is more threatened by wind sand flow when it traverses through the wind-sand area.In order to minimize the wind-sand hazard to the railway during route design,comprehensive route design criteria of high-speed railway in wind-sand area and the key points of high-speed railway alignment design in quicksand region,Gobi area and gale area are put forward by analyzing the influence mechanism of wind sand flow on the construction and operation of high-speed railway,based on the special natural conditions of wind-sand area and combined with the basic theory and method of railway alignment design.Taking the Lanzhou-Urumqi High-speed Railway as an example,this paper studies the application of the principle of comprehensive route design in strong wind-sand region from the aspects of route scheme design,project investment and environmental impact based on detailed investigation of wind blown sand area and analysis of existing data,and then a scientific and reasonable route design scheme of high-speed railway in wind-sand area is determined.Years of practical operation of the Lanzhou-Urumqi High-speed Railway shows that this method has good engineering application and can provide certain references for the route design of high-speed railway in wind-sand area in the future.
关 键 词:高速铁路 风沙地区 综合选线原则 选线要点 兰新高铁 选线设计
分 类 号:U212.32[交通运输工程—道路与铁道工程] U238
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.51