顾桥煤矿东区二水平主排水泵房优化设计  被引量:2

Optimal design of the second level main pump house in the east area of Guqiao Coal Mine

在线阅读下载全文

作  者:吴晓东 李翔 WU Xiaodong;LI Xiang(Hefei Design and Research Institute of Coal Industry Co.,Ltd.,Hefei 230041,China;Guqiao Coal Mine,Huaihe Energy Holding Group Co.,Ltd.,Huainan 232001,China)

机构地区:[1]煤炭工业合肥设计研究院有限责任公司,安徽合肥230041 [2]淮河能源控股集团有限责任公司顾桥煤矿,安徽淮南232001

出  处:《煤炭工程》2023年第3期8-11,共4页Coal Engineering

摘  要:针对主排水水泵房传统设计模式布置复杂、环节多、工期长、后期设备维护等问题,提出采用吸水池代替配水井、配水巷和吸水井的优化方案,设计优化后整个主排水泵房仅由泵房和吸水池组成,并在顾桥煤矿东区二水平主排水泵房应用,相比于传统方案,施工工期减少了约30 d,施工费用降低了18.9%。实践证明,该方案具有布置简单、环节少、功能齐全、工期及施工费用大幅度减少等优点,为煤矿生产创造了较大的经济效益和良好的安全效益。In view of the problems of the traditional design mode of the main drainage pump room,such as complex layout,redundant links,long construction period and late equipment maintenance,the optimization scheme using suction sump to replace the distribution well,distribution lane and suction well is proposed.After the design and optimization,the whole main drainage pump room is only composed of the pump room and the suction sump.The scheme is applied in the second level main drainage pump room in the eastern area of Guqiao Coal Mine.Compared to the traditional scheme,the construction period is shortened by about 30 days and the cost is reduced by 18.9%.Practice has shown that,the scheme has the advantages of a simple layout,less links,complete functions,which greatly reduces the construction period and cost,and provides considerable economic benefits and favorable safety benefits for coal mine production.

关 键 词:主排水泵房 吸水池 配水井 配水巷 吸水井 

分 类 号:TD214[矿业工程—矿井建设]

 