花坝水库泄水建筑物设计浅析  

Sluice Structure Design of Huaba Reservoir

在线阅读下载全文

作  者:廖富桂 LIAO Fugui(Zunyi Survey Design Institute of Water Conservancy and Hydropower Co.Ltd.,Zunyi 563002 China)

机构地区:[1]遵义市水利水电勘测设计研究院有限责任公司,贵州遵义563002

出  处:《红水河》2023年第2期38-42,48,共6页Hongshui River

摘  要:泄水建筑物的布置和设计的合理性,影响到水库工程的投资和运行安全。结合地形地质条件、枢纽建筑物布置、人工开挖边坡、开挖工程量及施工干扰等因素,设计优选了花坝水库泄水建筑物的布置及消能方式,并对其结构进行了优化。计算分析结果表明,溢洪道的泄流能力及结构抗滑稳定安全系数满足规范要求。目前工程正在施工,现场揭露的地质情况与设计基本相符,泄水建筑物设计安全可靠。The rationality of the layout and design of the sluice structure affects the investment and operation safety of the reservoir project.Combined with the factors such as topographic and geological conditions layout of hub buildings artificial excavation slope excavation quantity and construction interference the layout and energy dissipation mode of the sluice structure of Huaba Reservoir are designed and optimized and its structure is optimized.The calculation and analysis results show that the discharge capacity of the spillway and the safety factor of structural anti-sliding stability meet the requirements of the code.At present the project is under construction.The geological conditions revealed on the site are basically consistent with the design and the design of the sluice structure is safe and reliable.

关 键 词:泄水建筑物 溢洪道 泄洪方案 消能方案 结构设计 

分 类 号:TV651.1[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象