软弱富水地层盾构接收冻结法加固施工技术  

Strengthening Construction Technology of Shield Receiving Freezing Method in Soft Water Rich Stratumg

在线阅读下载全文

作  者:杨阳 YANG Yang(Beijing China Coal Mine Engineering Company Limited,Beijing 100013,China)

机构地区:[1]北京中煤矿山工程有限公司,北京100013

出  处:《价值工程》2023年第12期69-71,共3页Value Engineering

基  金:天地科技股份有限公司创新创业资金专项资助项目(2022-2-TD-QN010)。

摘  要:软弱破碎地层盾构接收施工风险较大,常用冻结法进行地基加固处理。以上海市轨道交通14号线云山路站端头井盾构接收冻结加固项目为背景,探讨在软弱富水地层中采用杯型冻结壁进行地层加固的盾构接收工艺及施工要点,保障盾构接收顺利完成,可为类似工程施工提供参考。The risk of shield receiving construction in soft and broken stratum is large,and the freezing method is often used for foundation reinforcement.Based on the project of shield receiving and freezing reinforcement of Yunshan Road station end shaft of Shanghai rail transit line 14,this paper discusses the shield receiving technology and construction points of using cup-shaped frozen wall for stratum reinforcement in soft water rich stratum,so as to ensure the smooth completion of shield receiving,which can provide reference for similar engineering construction.

关 键 词:冻结法 盾构接收 地基加固 施工技术 

分 类 号:U455.43[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象