检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吕云龙 Lv Yunlong(Kailuan Group Yuzhou Mining Industry Co.,Zhangjiakou,Hebei 075700)
机构地区:[1]开滦集团蔚州矿业公司,河北张家口075700
出 处:《江西煤炭科技》2023年第2期153-156,共4页Jiangxi Coal Science & Technology
摘 要:为保证矿井安全生产,对单侯矿6100N工作面采空区上覆岩层“三带”发育,顶板导水裂隙带发育高度进行分析。基于矿井地质条件,通过经验公式确定垮落带最大高度11.60 m,裂隙带最大高度45.78 m,确定导水裂隙带最大高度57.38 m;利用瞬变电磁法现场实测,确定顶板发育高度范围20~90.9 m,平均55.45 m,并最终确定6100N工作面顶板裂隙发育高度为57.38 m。In view of the development of"three zones"in the 6100N working face of Danhou Colliery,in order to ensure the safety production of the mine,this paper determines the development range of the water-conducting fractured zone on the roof of the 6100N working face.Based on the mine geological conditions,the maximum height of the caving zone is 11.60 m,the maximum height of the fractured zone is 45.78 m,and the maximum height of the water-conducting fractured zone is 57.38 m Based on the field measurement of transient electromagnetic method,the development height range of the roof is 20~90.9 m,55.45 m on average.
关 键 词:采空区上覆岩层 垮落带 裂隙带 冒落带 瞬变电磁法
分 类 号:TD745.2[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49