检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张锐 ZHANG Rui(China Railway 24th Bureau Group Fujian Railway Construction Co.,Ltd.,Fuzhou,Fujian 364000,China)
机构地区:[1]中铁二十四局集团福建铁路建设有限公司,福建福州364000
出 处:《自动化应用》2023年第6期174-176,共3页Automation Application
摘 要:随着经济的飞速发展,卫星城市的增加,城际轨道的桥梁工程也随之增多,为确保高墩桥梁工程支架在施工期间的稳定,不但要设计施工方案,也要加强施工管理,对其制定合理的沉降监测方案,实时量测反馈真实数据,有效分析控制变形,以满足安全施工要求。With the rapid development of economy and the increase of satellite cities,the number of inter city rail bridge projects also increases.In order to ensure the stability of high pier bridge engineering supports during construction,not only from the construction plan,but also from the construction management,it is quite necessary to develop a reasonable settlement monitoring plan for them,real-time measurement feedback of real data,effective analysis and control of deformation,to meet the requirements of safe construction.
分 类 号:U442[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49