锦屏二级水电站避沙运行方式风险分析及管控措施研究  

Research on Risk Analysis and Control Measures of Sediment Avoidance Operation Mode of Jinping-ⅡHydropower Station

在线阅读下载全文

作  者:张海川 杨武 李家银 廖伟 ZHANG Haichuan;YANG Wu;LI Jiayin;LIAO Wei(Yalong River Hydropower Development Company Ltd.,Chengdu Sichuan 610051)

机构地区:[1]雅砻江流域水电开发有限公司,四川成都610051

出  处:《四川水力发电》2023年第2期132-134,139,共4页Sichuan Hydropower

摘  要:在库区水流泥沙含量较高时,锦屏二级水电站需采取避沙运行方式,以降低泥沙对机组运行的不利影响。但避沙运行期间的特殊工况也将对电站的安全稳定运行提出严峻考验,故针对锦屏二级水电站的避沙运行方式进行了风险分析,最后提出的对应管控措施可有效应对电站避沙运行过程中可能产生的各种风险。When the sediment content in the reservoir area is high,Jinping-ⅡHydropower Station needs to adopt the sediment avoidance operation mode to reduce the adverse impact of sediment on the operation of units.The special conditions during the sediment avoidance operation will also become a severe test for the safety and stability of operation,therefore,a risk analysis is carried out for the sediment avoidance operation mode of Jinping-ⅡHydropower station,and the corresponding control measures proposed at the end can effectively deal with various risks that may arise during the sediment avoidance operation.

关 键 词:锦屏二级水电站 避沙运行 风险分析 管控措施 

分 类 号:TK227[动力工程及工程热物理—动力机械及工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象